Reviewed servicing and stormwater submissions for condominium developments from mid-rise to 40+ storeys — from first FSR submission through to approval.
Get Your Development
Approved.
Licensed P.Eng. consultancy preparing Functional Servicing Reports, Stormwater Management Reports, Servicing Plans, and Grading Plans for Ontario development applications — faster, smarter, with fewer revisions.
Engineering Reports
That Get Approved.
We prepare the technical engineering documents municipalities require before they approve your development application. Every report is prepared by a licensed P.Eng. with direct municipal review experience.
Functional Servicing Reports
The primary technical document for OPA, ZBA, and Site Plan applications. We address water, sanitary, and storm servicing to municipal satisfaction — the first time.
Learn more →Stormwater Management Reports
Quantity control, quality control, and water balance analysis aligned with Ontario Ministry guidelines and conservation authority requirements.
Learn more →Capacity Studies
Independent analysis of trunk water, sanitary, and storm infrastructure capacity for high-density or large-scale development proposals.
Learn more →Feasibility Studies
Pre-application assessment of servicing feasibility, connection options, and approval risk before committing to a site — front-end due diligence that saves time and cost.
Learn more →Grading Plans
Site grading and drainage design coordinated with the SWM strategy and municipal road grades, sealed for SPA and subdivision registration.
Learn more →Servicing Plans
Engineering drawings showing water, sanitary, and storm infrastructure layout, connection points, and invert elevations for SPA and subdivision submissions.
Learn more →Plan & Profile Drawings
Plan and profile drawings for sewer and watermain installation in road right-of-ways, prepared to municipal design standards for construction-stage submissions.
Learn more →Development Packages
Complete OPA, ZBA, and SPA engineering packages — FSR, SWM, Servicing Plan, and Grading Plan prepared as a coordinated, internally consistent submission set.
Learn more →Municipal Coordination
Technical comment response, resubmission management, and direct coordination with municipal engineering staff until your approval is issued.
Learn more →Conservation Authority Permitting
Permit applications, technical submissions, and direct agency coordination for development in or near CA-regulated areas throughout Ontario.
Learn more →From Application to Approval
Pre-Application Review
We review the municipality’s requirements, the site conditions, and the proposed development to identify exactly which technical reports your application needs.
Scoping & Proposal
We define the technical scope precisely, flag site-specific constraints up front, and provide a fixed-fee proposal with a realistic delivery timeline.
Report Preparation
A licensed P.Eng. prepares your FSR, SWM, or other required report. Drafted, checked, and issued to submission standard — not a first draft.
Review & Coordination
We respond to reviewer comments directly and coordinate with municipal staff and agencies until your approval is issued. Included in scope.
We’ve Seen It
From Both Sides.
Our engineers have worked inside municipal review processes. That experience changes how we write reports — and reduces your revision rounds.
Talk to an EngineerMunicipal Review Experience
We know what triggers a comment letter before we submit. Our reports address the concerns reviewers raise — because we’ve written those comments ourselves.
Direct Engineer Contact
You work directly with a licensed P.Eng., not an account manager. You can ask technical questions and get direct answers.
Fixed-Fee Pricing
Scope is defined upfront and pricing is fixed. No surprise invoices when a project gets technically complex or a comment letter arrives.
Ontario-Only Focus
We work exclusively in Ontario. Every municipality we operate in, we know the local staff, design standards, and preferred submission formats.
Municipalities We Know
We work across Ontario with a focus on municipalities where we have established relationships with technical review staff.
Not listed? Contact us — we work across Ontario.
Review-Side Experience
Before Bous Engineering, years inside municipal development review — reading submissions the way your reviewer will.
Development review experience on large-scale institutional and industrial sites, including campus-scale servicing, capacity, and grading.
Hundreds of submissions reviewed from the municipal side: the comments that stall approvals, the resubmission cycles that follow, and how both are avoided.
Engineering Notes
for Developers
Short, practical notes on City approvals, servicing, and avoiding delays.
How Conservation Authority Requirements Shape Ontario Stormwater Design
Conservation authorities control stormwater approvals in Ontario through watershed-specific requirements that often exceed municipal standards—early engagement is essential.
Read article →Toronto Foundation Drainage Policy: What Changes October 1, 2026
Toronto's revised Foundation Drainage Policy, effective October 1, 2026, allows groundwater discharge to storm sewers under specific conditions — potentially saving mid-rise developers $1M–$3M in servicing costs.
Read article →Site Plan Approval in Ontario: What the 2026 Changes Actually Mean
Projects up to 10 residential units now bypass Site Plan Approval in Ontario — but the technical engineering requirements remain. Here's what that means in practice.
Read article →Engineers Who Know
the Review Side.
Bous Engineering was founded by licensed P.Eng.s who spent years working inside Ontario municipal review processes — reviewing the same kinds of reports we now prepare for our clients.
That perspective changes everything. We know what municipal reviewers look for because we’ve been on that side of the table. Our clients receive fewer revision requests, on average, than they did with comparable firms.
Trusted by Ontario Developers
“Working with Bous Engineering reduced our revision rounds from four to one on our last SPA application. They clearly understand how Ottawa reviews these submissions.”
“Fast turnaround, clean reports, and direct communication with an actual P.Eng. That’s exactly what we needed for our infill project in Hamilton.”
“Their SWM report sailed through the RVCA review with no comments. First time that’s happened on one of our projects. We’ve used them on every project since.”
Ready to get your development
approved faster?
Most projects start with a short call. Tell us about your site and your timeline — we’ll tell you what’s technically required and how long it’ll take.
Let’s Talk About
Your Project.
Most projects start with a 20-minute call. No commitment required. We’ll tell you what’s technically required and what a realistic timeline looks like for your municipality.
- Email contact@bousengineering.ca
- Location Ottawa, ON
- Service Area Serving Ontario